Installation & Instruction

HUST Vietnam hands over HAST Chamber at Thang Long IP

HUST Vietnam has successfully completed the installation, commissioning, and handover of a HIRAYAMA (Japan) HAST (Highly Accelerated Stress Test) chamber

See more

HUST VN deploys the SIR13 to evaluate the insulation reliability

HUST Vietnam has successfully completed the installation and operational training for the SIR13 insulation reliability and degradation measurement equipment - manufactured by ETAC (Japan)

See more

HUST Vietnam hands over salt spray machine to Song Than 3 IP

At the end of July 2026, HUST Vietnam's technical team successfully installed the Salt Spray Tester (model: VT-ST200) of Vision Tec (Korea) at Song Than 3 Industrial Park, Ho Chi Minh City

See more

HUST Vietnam delivers Dry Oven at Thang Long IP

HUST Vietnam has successfully completed the installation, commissioning, and handover of an Dry oven for a manufacturing company located in Thang Long Industrial Park

See more

HUST Vietnam installs and delivers Rheo Mooney Viscometer in Hung Yen

HUST Vietnam has just completed the installation, calibration, testing and handover of Myung Ji Tech's Rheo Mooney Viscometer (Model: Combo)

See more

HUST installs and hands over temp-humid chamber and attenuation measurement equipment at Chau Duc IP

At the end of June 2026, HUST Vietnam's engineering team successfully completed the installation, commissioning, and operator training for an ETAC SXN403-E Temperature & Humidity Test Chamber and an ETAC SIR13 Surface Insulation Resistance (SIR) Measureme

See more